The Malampaya Phase 4 (MP4) project has delivered first gas from the Malampaya East-1 and Camago-3 wells into the existing Malampaya production system offshore Palawan, adding an estimated 222 Bcf of recoverable natural gas reserves.


The Malampaya Phase 4 (MP4) project has delivered first gas from the Malampaya East-1 and Camago-3 wells into the existing Malampaya production system offshore Palawan, adding an estimated 222 Bcf of recoverable natural gas reserves.