Aker Solutions has won detail design work for three topsides and four jackets on QatarEnergy’s redevelopment of the Maydan Mahzam oil field, which has been producing since 1965.


Aker Solutions has won detail design work for three topsides and four jackets on QatarEnergy’s redevelopment of the Maydan Mahzam oil field, which has been producing since 1965.