Petrobras’ P-80 and P-82 FPSOs are preparing to sail for the Búzios field, where the two high-capacity units will add a combined 450,000 bpd and increase the field’s installed production capacity by about 34%.


Petrobras’ P-80 and P-82 FPSOs are preparing to sail for the Búzios field, where the two high-capacity units will add a combined 450,000 bpd and increase the field’s installed production capacity by about 34%.
Leave a Reply